![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1335074.1 : How to Remove and Replace a SPARC T3-2 Battery:ATR:1335074.1:0
In this Document
Applies to:SPARC T3-2 - Version All Versions and laterInformation in this document applies to any platform. GoalReplace SPARC T3-2 battery. ********************************************************************************** SolutionDISPATCH INSTRUCTIONS WHAT SKILLS ARE REQUIRED: No special skills required, Customer Replaceable Unit (CRU) procedure Time Estimate: 60 minutes Task Complexity: 0 REMOVAL/REPLACEMENT INSTRUCTIONS: WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : DAMAGE ALERT: Perform a visual inspection of the replacement part to make sure that there are no damaged components, connectors, bent pins, damaged packages during shipping, etc. If the part is damaged, don't install it into the system, order a new part. Handle with caution and package carefully the return part to avoid any damages during shipping.
The system battery is a cold-service component 1. Prepare for servicing: a. Attach an antistatic wrist strap. b. Power off the server and unplug power cords from the power supplies. c. Extend the server to maintenance position. d. Remove the top cover. 2. Remove the battery from the battery holder by pulling back on the metal tab holding it in place and sliding the battery up and out of the battery holder.
WHAT ACTIONS ARE REQUIRED:
1. Unpack the replacement battery. 2. Press the new battery into the battery holder with the positive side (+) facing away from the metal tab that holds it in place. 3. If the service processor is configured to synchronize with a network time server using the Network Time Protocol (NTP), the ILOM clock will be reset as soon as the server is powered on and connected to the network. Otherwise, proceed to the next step. 4. If the service processor is not configured to use NTP, you must reset the ILOM clock using the ILOM CLI or the web interface. For instructions, see the Oracle Integrated Lights Out Manager (ILOM) 3.0 Documentation Collection. 5. Return the server to operation: a. Return the server to the normal rack position. b. Reinstall the power cords to the power supplies and power on the server.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Verify functionality, no service LEDs or messages.
PARTS NOTE: https://support.oracle.com/handbook_private/Systems/SPARC_T3_2/components.html#Batteries
REFERENCE INFORMATION: SPARC T3-2 Server Documentation: http://docs.oracle.com/cd/E19166-01/index.html
See also Oracle Integrated Lights Out Manager (ILOM) 3.0 Documentation: http://docs.oracle.com/cd/E19860-01/index.html Attachments This solution has no attachment |
||||||||||||||
|