Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1319505.1
Update Date:2018-04-04
Keywords:

Solution Type  Technical Instruction Sure

Solution  1319505.1 :   How to Replace a Sun Blade X6275 Mezzanine Card  


Related Items
  • Sun Blade 6048 System
  •  
  • Sun Blade 6000 System
  •  
  • Sun Blade X6275 Server Module
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP

Applies to:

Sun Blade 6000 System - Version All Versions and later
Sun Blade 6048 System - Version All Versions and later
Sun Blade X6275 Server Module - Version All Versions and later
Information in this document applies to any platform.

Goal

How to Remove and Replace a Sun Fire X6275 Mezzanine Card

Solution

CAP PROBLEM OVERVIEW: X6275, Mezzanine Card with 2 Service Processors

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
X6275 Trained

TASK COMPLEXITY: 4

TIME ESTIMATE: 120 minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

Take ESD Precautions

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Prepare the server module for service.

* Power off both server module compute nodes.
* Remove the server module from the Sun Blade chassis. Place it on a flat surface.
* Attach an antistatic wrist strap.
* Remove the server module top cover.

2. Remove the new service processor from its shipping container and place it on an antistatic surface.

3. Remove the three screws that fasten the old service processor to the motherboard.

4. Lift the service processor straight up to remove it.

5. Lower the new service processor onto the motherboard.

* Lower the service processor straight onto the connector. Do not force it.

6. Return the server module to operation.

* Install the server module top cover on the new motherboard.
* Insert the server module into the Sun Blade chassis.
* Power on the server module.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Verify functionality, no service LEDs or messages

PARTS NOTE:

REFERENCE INFORMATION:

Sun Blade X6275 Server Module Service Manual

http://download.oracle.com/docs/cd/E19464-01/820-6849-13/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback