Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1316249.1
Update Date:2017-03-22
Keywords:

Solution Type  Technical Instruction Sure

Solution  1316249.1 :   How to Remove and Replace a T3 Battery:ATR:1732:1  


Related Items
  • Sun Storage T3 Array
  •  
  • Sun Storage T3+ Array
  •  
  • Sun Storage T3 Array for the Workgroup (T3WG)
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP

Applies to:

Sun Storage T3 Array - Version All Versions to All Versions [Release All Releases]
Sun Storage T3+ Array - Version All Versions to All Versions [Release All Releases]
Sun Storage T3 Array for the Workgroup (T3WG) - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

T3 Battery Replacement

Solution

DISPATCH INSTRUCTIONS

TASK COMPLEXITY: 1

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)

T3 product training

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW:

. UPS Battery close to the end of its life span (two years)

. Messages indicating UPS Battery life span is approaching its end appearing in the syslog file

. UPS Battery defective or failed.

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

Array volumes backup recommended.

No special state required as long as the rest of the array modules are healthy, specially the remaining Power and Cooling unit.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Remove the Power and Cooling unit from the array

1.a. Power off the Power and Cooling unit by pressing the power switch

1.b. Disconnect the power cable from the AC outlet and from the Power and Cooling unit in that order

1.c. Unlock the Power and Cooling unit by using a coin or a small screwdriver to push in and release the two latch handles

1.d. Pull the Power and Cooling unit out of the array

2. Turn the removed Power and Cooling unit bottom-up

3. Remove the four Phillips screws from the panel of the bottom and side of the Power and Cooling unit

4. Slide the bottom panel off the unit slightly, enough to expose the battery connector

5. Remove the battery connector by pulling on it firmly straight out from the connector inside the Power and Cooling unit

6. Lift the bottom panel with the battery away from the unit and set it aside

7. Connect the replacement battery to the connector of the Power and Cooling unit

8. Seat the battery pack in the Power and Cooling unit such that the bottom panel is flush with the edges of the Power and Cooling unit

9. Replace the four Phillips screws and secure the bottom panel to the Power and Cooling unit

10. Reinstall the Power and Cooling unit in the array

10.a. Lock the Power and Cooling Unit by pushing in both latch handles

10.b. Connect the power cable to the Power and Cooling unit and to the AC outlet in that order

11. Press the power switch to the ON position

12. Verify that the AC LED on the Power and Cooling unit is amber, indicating that it is receiving AC power.

13. Reset the date by typing .bat -n u pcu from the T3+ CLI promt,

             Where u is the unit number and pcu is the Power and Cooling unit number

14. Verify Battery life Warranty Date' and 'Battery Life Used'.

              Type    .id write busage u(x)pcu(y) 0

              Type     id read u(x)pcu(y)

15. Check the Power and Cooling unit status using the 'fru stat' command or the Storage Automated Diagnostic Environment

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
No actions needed

PARTS NOTE:

REFERENCE INFORMATION:

Sun StorEdge T3 and T3+ Array Field Service Manual - Part Number: 816-4774-xx
http://download.oracle.com/docs/cd/E19957-01/


TIME ESTIMATE: 30 minutes


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback