Asset ID: |
1-71-1316247.1 |
Update Date: | 2017-07-28 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1316247.1
:
How to Remove and Replace a SE6X20 and T3 Power Cooling Unit:ATR:1730:2 [Video]
Related Items |
- Sun Storage T3 Array
- Sun Storage 6120 Array
- Sun Storage 6020 Array
- Sun Storage T3+ Array
- Sun Storage 6320 System
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
- Microlearning>Video>ML-VID-VCAP
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP
Applies to:
Sun Storage 6320 System - Version All Versions to All Versions [Release All Releases]
Sun Storage T3+ Array - Version All Versions to All Versions [Release All Releases]
Sun Storage 6020 Array - Version All Versions to All Versions [Release All Releases]
Sun Storage T3 Array - Version All Versions to All Versions [Release All Releases]
Sun Storage 6120 Array - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.
Goal
How to Remove and Replace a Sun StorEdge 6020/6120 Array Power Cooling Unit (PCU) and a Sun StorEdge T3 Array Power Cooling Unit (PCU)
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
T3 / 6x20 product training
TASK COMPLEXITY: 2
TIME ESTIMATE: 60 minutes
FIELD ENGINEER INSTRUCTIONS
PROBLEM OVERVIEW:
Replace Power Cooling Unit (PCU)
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution.
The customer is not required to perform a system shutdown.
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Follow standard ESD precautions.
Follow procedures documented in the respective service documentation listed below. Note that the documentation for the SE6x20 product includes cases for standalone SE6120 enclosures and how to handle an array chassis mounted in a Maserati rack. The customer may have to re-register a standalone array with their management software.
1. Turn off, uncable, and remove old PCU
2. Transfer Battery from old PCU to replacement part
3. Insert, cable, and turn on New PCU.
4. PCU LED should be green after PCU is replaced.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Fru status should show PCU as ready/enabled and battery status as ready/enabled or charging.
PARTS NOTE: Cache Battery is not included in PCU FRU.
REFERENCE INFORMATION:
T3 and T3+ Array Installation, Operation and Service Manual: http://download.oracle.com/docs/cd/E19699-01/
Storedge 6320 System 1.2 Reference and Service Guide: http://download.oracle.com/docs/cd/E19957-01/
6020 and 6120 Array Systems Manual:
http://download.oracle.com/docs/cd/E19908-01/
Attachments
This solution has no attachment