![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 1312771.1 : How to Replace and Remove a Ultra Enterprise 3500/4500/5500/6500 Clock Board:ATR:1142:1
In this Document
Oracle Confidential (INTERNAL). Do not distribute to customers
Applies to:Sun Enterprise 3000 Server - Version: Not Applicable to Not Applicable - Release: N/A to N/ASun Enterprise 3500 Server - Version: Not Applicable to Not Applicable [Release: N/A to N/A] Sun Enterprise 4000 Server - Version: Not Applicable to Not Applicable [Release: N/A to N/A] Sun Enterprise 4500 Server - Version: Not Applicable to Not Applicable [Release: N/A to N/A] Sun Enterprise 5000 Server - Version: Not Applicable to Not Applicable [Release: N/A to N/A] Information in this document applies to any platform. Goal******************************************************************************To report errors or request improvements on this procedure, please go to http://support.us.oracle.com and put a comment on Doc ID: 1312771.1 ****************************************************************************** How to Replace and Remove a Ultra Enterprise 3500/4500/5500/6500 Clock Board SolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner. - TIME ESTIMATE: 15 minutes - TASK COMPLEXITY: 1 FIELD ENGINEER INSTRUCTIONS PROBLEM OVERVIEW: How to replace a Clock board WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The customer should conduct an orderly software and system shutdown. System power off is required. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: *** Follow standard ESD procedures to avoid Electrostatic Discharge 1. Unfasten cable connectors from the clock+ board front panel and set them aside 2. Loosen the two captive screws securing the board to the system chassis 3. Pull the ends of both extraction levers outward simultaneously to release the board from the centerplane receptacles 4. If you are replacing the clock+ board, remove the TOD NVRAM from the old board and place it on the new board. *** This is necessary to match the host ID with the Ethernet ID. 5. Use the extraction levers to seat the replacement board. Simultaneously swing both levers into the locked position. Do not press on board front panel to seat it---doing so will damage the connector pins. 6. Secure the board to the chassis using the two captive screws, one on each side 7. Connect any applicable interface cables to the front panel of the board OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Verify the green led is lit on the clock board. Boot the system and start the applications. PARTS NOTE: None REFERENCE INFORMATION: E3000 Reference E3500 Reference E4000/5000/6000 Reference E4500/5500/6500 Reference Attachments This solution has no attachment |
||||||||||||
|