Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1312555.1
Update Date:2017-10-18
Keywords:

Solution Type  Technical Instruction Sure

Solution  1312555.1 :   How to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 PCMCIA Interface/SBus Board  


Related Items
  • Sun Enterprise 5000 Server
  •  
  • Sun Enterprise 3500 Server
  •  
  • Sun Enterprise 3000 Server
  •  
  • Sun Enterprise 4000 Server
  •  
  • Sun Enterprise 5500 Server
  •  
  • Sun Enterprise 6000 Server
  •  
  • Sun Enterprise 6500 Server
  •  
  • Sun Enterprise 4500 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

Sun Enterprise 5500 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 6000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 5000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 6500 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 3000 Server - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

How to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 PCMCIA Interface/SBus Board


******************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1312555.1
******************************************************************************

Fix

TASK COMPLEXITY: 1

TIME ESTIMATE: 60 minutes.

DISPATCH INSTRUCTIONS

 

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)

Basic Sun hardware FE skills

 

DELIVERY REQUIREMENT:

Schedule with maintenance window within contractual terms.

 

FIELD ENGINEER INSTRUCTIONS

 

PROBLEM OVERVIEW:

Replace a PCMCIA Interface/SBus Card

 

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

 

The customer should conduct an orderly software system shutdown.

 

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:

Removing a Board for a PCI/SBus Card replacement

1. Ensure that the board has been disabled by the ASR software. See "Hot-Plug Feature".

either (a) the three LEDs on the board are not lit (board has no power).

or (b) the outer two green LEDs are not lit and the middle yellow LED is lit (board in low power mode).

 

2. Use a Phillips #1 screwdriver to unlock the board.

 

3. Pull the ends of both extraction levers outward simultaneously to unseat the board centerplane connector from the centerplane receptacles.

 

4. If the board is not immediately replaced, a load board (Enterprise 6500 systems only) or a filler panel (Enterprise 4500 and 5500 systems only) must be installed in its place.

 

5. Replace the PCI/SBus Card

 

Installing a Board after a PCI/SBus Card replaced

1. Carefully insert the board (component side down if in front; component side up if in the rear) in the proper slot in the card cage, ensuring that the board does not slip out of the left and right card guide.

 

2. Ensure that both extraction levers are in the insert position (arrow pointing outward), and that the quarter-turn access slots are unlocked (arrow indicates unlocked position) as you slide the board toward the centerplane receptacles.

 

3. Push the board into the card cage, then simultaneously press both extraction levers to seat the board on the centerplane.

 

4. Mechanically lock the board to the system chassis by inserting a Phillips #1 screwdriver into each quarter-turn access slot and then turning to the locked position.

 

5. Once the board has been installed, a message similar to the following will be displayed on the monitor (if the system is powered on):

 

NOTICE: CPU Board Hotplugged into Slot 6

NOTICE: Board 6 is ready to remove

 

6. Reboot the system now or schedule a later time to reboot when system disruption will be minimized.

 

OBTAIN CUSTOMER ACCEPTANCE

 

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

Restart system and have the System administrator verify functionality of system.

 

PARTS NOTE:

None

 

REFERENCE INFORMATION:

 

E3000 Reference

E3500 Reference

E4000/5000/6000 Reference

E4500/5500/6500 Reference

 

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback