Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1311217.1
Update Date:2017-10-18
Keywords:

Solution Type  Technical Instruction Sure

Solution  1311217.1 :   How to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 HIPPI Card  


Related Items
  • Sun Enterprise 5000 Server
  •  
  • Sun Enterprise 3500 Server
  •  
  • Sun Enterprise 3000 Server
  •  
  • Sun Enterprise 4000 Server
  •  
  • Sun Enterprise 5500 Server
  •  
  • Sun Enterprise 6500 Server
  •  
  • Sun Enterprise 6000 Server
  •  
  • Sun Enterprise 4500 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

Sun Enterprise 4500 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 3000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 4000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 5000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Enterprise 3500 Server - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

How to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 HIPPI Card

******************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1311217.1
******************************************************************************

Fix

DISPATCH INSTRUCTIONS

 

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:

Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner.

TIME ESTIMATE: 30 minutes

TASK COMPLEXITY: 1

 

DELIVERY REQUIREMENT:

Schedule for immediate replacement within contractual terms.

 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:

 

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

 

The customer should conduct an orderly software and system shutdown.

System power off is required.

 

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

*** Follow standard ESD procedures to avoid Electrostatic Discharge

 

1. Identify the slot of the card to be replaced.

 

2. The system could be mounted in a rack, so it will be necessary to use some tools to umount it

 

3. Release the IO board containing the failing sbus from the system card cage

 

4. Remove PCI card and insert replacement card

 

5. Replace IO board into system. Reconnect cables.

 

OBTAIN CUSTOMER ACCEPTANCE

 

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

 

 

PARTS NOTE:

None

 

REFERENCE INFORMATION:

 

E3000 Reference

E3500 Reference

E4000/5000/6000 Reference

E4500/5500/6500 Reference

 

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback