Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310994.1
Update Date:2017-06-29
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310994.1 :   How to Remove and Replace a M4000 M5000 Memory Board:ATR:1721:2 [Video]  


Related Items
  • Sun SPARC Enterprise M4000 Server
  •  
  • Sun SPARC Enterprise M5000 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  
  • Microlearning>Video>ML-VID-VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: cap

Applies to:

Sun SPARC Enterprise M4000 Server - Version All Versions to All Versions [Release All Releases]
Sun SPARC Enterprise M5000 Server - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

How to Remove and Replace M4000 M5000 Memory Board

********************************************************************************
To report errors or request improvements on this procedure,
please go to http://mosemp.us.oracle.com and put a comment on Doc ID: 1310994.1
********************************************************************************

 

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
M-Series training and basic field engineer skills

TASK COMPLEXITY: 2

TIME ESTIMATE: 150 minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

1. Shut down all domains

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Shut down all applications (if running) on all domains on platform.
2. Shut down all domains.
3. Power off the platform.
4. ESD Safety: Ensure ESD strap is connected to field engineer and platform chassis
5. Unplug the power cords.
6. Remove top cover.
7. Pinch the handles together and pull both levers upwards simultaneously to unseat the memory board.
8. Slide the memory board out of the server and place it on the ESD mat.
9. Swap DIMMs from old memory board to new.
10. Place memory board in server.
11. Push the levers inwards simultaneously to seat the memory board.
12. Replace the top cover.
13. Power on the platform
14. Confirm hardware fix by running the following commands:

XSCF> showhardconf -M
XSCF> showstatus
Note:  Please be aware when running XCP1114 the MBU status may become "degraded" and won't be able to be cleared.  See doc 1538391.1 for more information.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: N/A

PARTS NOTE:

REFERENCE INFORMATION:
Service Manual: http://download.oracle.com/docs/cd/E19855-01/index.html



Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback