Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310979.1
Update Date:2017-11-29
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310979.1 :   How to remove and replace M4000 M5000 XSCFU:ATR:1552:2  


Related Items
  • Sun SPARC Enterprise M5000 Server
  •  
  • Sun SPARC Enterprise M4000 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: cap

Applies to:

Sun SPARC Enterprise M5000 Server - Version Not Applicable and later
Sun SPARC Enterprise M4000 Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to remove and replace M4000 M5000 XSCFU
********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1310979.1
********************************************************************************

Solution

DISPATCH INSTRUCTIONS:

WHAT SKILLS DOES THE ENGINEER NEED:
Mseries training and basic field engineer skills

TASK COMPLEXITY: 2

TIME ESTIMATE: 90 minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

All domains must be shut down.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Put keyswitch in service position.
Power off the server. (system unplugged completely)
Label and remove the Ethernet and UPC cables connecting to the XSCFU.
Pinch the handle and then pull the lever on the XSCF unit downward to unseat the board
Remove the board from the slot and place it on the ESD mat.
Place the XSCF unit on the lip and gently slide it into the slot.
Lock the lever into place to seat the board.
Connect the ethernet and UPC cables to the XSCFU.

Note: FE should connect to the serial port of the newly installed XSCF in order to collect POST and XSCF startup output. In case of unexpected FRU behavior the data should be uploaded into the SR


Power on the platform (plug in the power cords)
You must immediately upgrade the XCP image on the new XSCF via the flashupdate command to the lastest available via download.

Ensure XSCFU clock is set correctly
Syntax:
XSCF> setdate -s MMDDhhmmyyyy.ss
same example: 05-OCT-2015 13:10:00
XSCF> setdate -s 100513102015.00

Put keyswitch in locked position
Confirm hardware fix by running the following commands:
XSCF> showhardconf -M
XSCF> showstatus

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: N/A

PARTS NOTE:

REFERENCE INFORMATION:
Service Manual: http://download.oracle.com/docs/cd/E19855-01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback