Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310950.1
Update Date:2017-06-29
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310950.1 :   How to Remove and Replace a M4000 M5000 IO Unit:ATR:1801:2 [Video]  


Related Items
  • Sun SPARC Enterprise M4000 Server
  •  
  • Sun SPARC Enterprise M5000 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  
  • Microlearning>Video>ML-VID-VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP

Applies to:

Sun SPARC Enterprise M4000 Server - Version All Versions to All Versions [Release All Releases]
Sun SPARC Enterprise M5000 Server - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

A video procedure on how to Remove and Replace a M4000 M5000 IO Unit

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
Engineer should be M4000/M5000 product trained

TASK COMPLEXITY: 2

TIME ESTIMATE: 45 Minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Turn key switch to the Service position, confirming that the POWER LED is off, and disconnect power cables

Remove the I/O unit
1. Disconnect and label all the cables that connect to the I/O unit.
2. Remove the cassettes from the I/O unit.
3. Disconnect the cabinet end of the cable management arm.
4. Using a No. 1 screwdriver, press the lock button on the left side of the I/O unit to free the unit release lever
5. Lower the unit release lever to unseat the I/O unit.
6. Remove the I/O unit from the slot and place it on the ESD mat.
7. Verify the new IOU has the DDC's properly installed.

Installation is the reverse of the above procedure

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Boot and check for full functionality.

Confirm the hardware by running the following commands:
XSCF> showhardconf -M
XSCF> showstatus

REFERENCE INFORMATION:
Service Manual: http://download.oracle.com/docs/cd/E19855-01/index.html

 

********************************************************************************
To report errors or request improvements on this procedure,
please go to http://mosemp.us.oracle.com and put a comment on Doc ID: 1310950.1
********************************************************************************


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback