![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1310861.1 : How to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 PCI Card
In this Document
Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential). Applies to:Sun Enterprise 4500 Server - Version Not Applicable to Not Applicable [Release N/A]Sun Enterprise 3000 Server - Version Not Applicable to Not Applicable [Release N/A] Sun Enterprise 3500 Server - Version Not Applicable to Not Applicable [Release N/A] Sun Enterprise 4000 Server - Version Not Applicable to Not Applicable [Release N/A] Sun Enterprise 5000 Server - Version Not Applicable to Not Applicable [Release N/A] Information in this document applies to any platform. GoalHow to Replace and Remove an Ultra Enterprise 3500/4500/5500/6500 PCI Card ****************************************************************************** FixDISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner. TIME ESTIMATE: 60 minutes. TASK COMPLEXITY: 1
DELIVERY REQUIREMENT: Schedule with maintenance window within contractual terms.
FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
PROBLEM OVERVIEW: Replace PCI Card
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
The customer should conduct an orderly software system shutdown.
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:
Removing a Board for a PCI Card replacement 1. Ensure that the board has been disabled by the ASR software. See "Hot-Plug Feature". either (a) the three LEDs on the board are not lit (board has no power). or (b) the outer two green LEDs are not lit and the middle yellow LED is lit (board in low power mode).
2. Use a Phillips #1 screwdriver to unlock the board.
3. Pull the ends of both extraction levers outward simultaneously to unseat the board centerplane connector from the centerplane receptacles.
4. If the board is not immediately replaced, a load board (Enterprise 6500 systems only) or a filler panel (Enterprise 4500 and 5500 systems only) must be installed in its place.
5. Replace the PCI Card
Installing a Board after a PCI Card replaced 1. Carefully insert the board (component side down if in front; component side up if in the rear) in the proper slot in the card cage, ensuring that the board does not slip out of the left and right card guide.
2. Ensure that both extraction levers are in the insert position (arrow pointing outward), and that the quarter-turn access slots are unlocked (arrow indicates unlocked position) as you slide the board toward the centerplane receptacles.
3. Push the board into the card cage, then simultaneously press both extraction levers to seat the board on the centerplane.
4. Mechanically lock the board to the system chassis by inserting a Phillips #1 screwdriver into each quarter-turn access slot and then turning to the locked position.
5. Once the board has been installed, a message similar to the following will be displayed on the monitor (if the system is powered on):
NOTICE: CPU Board Hotplugged into Slot 6 NOTICE: Board 6 is ready to remove
6. Reboot the system now or schedule a later time to reboot when system disruption will be minimized.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: Restart system and have the System administrator verify functionality of system.
PARTS NOTE: None
REFERENCE INFORMATION:
Attachments This solution has no attachment |
||||||||||||||
|