Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310407.1
Update Date:2017-11-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310407.1 :   How to Replace a V245 Front I/O Board Assembly:ATR:1253:1  


Related Items
  • Sun Fire V245 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

Sun Fire V245 Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to replace a V245 Front I/O Board Assy

Solution

*DISPATCH INSTRUCTIONS*

WHAT SKILLS DOES THE ENGINEER NEED:
Nothing beyond basic product training.

TIME ESTIMATE: 40 minutes

TASK COMPLEXITY: 1

*FIELD ENGINEER INSTRUCTIONS*

PROBLEM OVERVIEW:
Front IO Board Assembly is faulty.

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution
Customer should conduct an orderly software system shutdown
Power down System & disconnect Power Cords

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Follow standard ESD procedures to avoid Electrostatic Discharge

1. Power off the system.
2. Remove the rear cover.
3. Remove the air baffle.
4. Remove the bezel.
5. Remove the front cover.
6. Remove the motherboard to front I/O board cable.
This cable connects the front I/O and motherboards.
7. Remove all six fan trays.
8. Remove the fan tray connector boards from the front I/O board.
9. Remove the front indicator board.
10. Remove the front I/O board
11. Unpackage the front I/O board and place it on an antistatic mat.
12. Tip the front I/O board downwards and slightly forward.
13. Push I/O board into place, aligning the board with the chassis.
When the board is fully seated the USB port is mounted flush against the front of
the chassis assembly.
14. Reinstall the front indicator board.
15. Reinstall the fan tray connector boards.
16. Reinstall all six fan trays.
17. Reinstall the motherboard to front I/O board cable
18. Reinstall the air baffle.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Boot the system and start the application as per the sys admin procedure


PARTS NOTE:

Sun Fire V245

https://mosemp.us.oracle.com/handbook_internal/Systems/SunFireV245/components.html

 


REFERENCE INFORMATION:
Sun Fire V215 and V245 Servers Service Manual



Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback