Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310131.1
Update Date:2017-05-31
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310131.1 :   How to Remove and Replace a V445 Battery:ATR:1122:1  


Related Items
  • Sun Fire V445 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP

Applies to:

Sun Fire V445 Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to remove and replace a Sun Fire V445 Battery

Solution

DISPATCH INSTRUCTIONS

This Action Plan requires the use of a coin cell battery which the FE will usually supply. In some instances, the FE may contact dispatch to request that the battery be ordered.

FE INSTRUCTIONS

This action plan requires the use of a coin cell battery. The coin cell battery should be retrieved from your personal stock of coin cell batteries. If you cannot readily obtain the correct quantity of these batteries, please contact dispatch to arrange for order.

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
No specific skills required

TIME ESTIMATE: 30 Minutes

TASK COMPLEXITY: 1

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW:
Faulty Battery

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Power off the server
2. Remove the main cover
Caution ! The system supplies power to the system controller card even when the
system is powered off. To avoid personal injury or damage to the system controller
card, you must disconnect the AC power cords before servicing the system controller
card or any of its components.
3. Locate the Advanced Lights Out Manager (ALOM) system controller card.
4. Remove the system controller card from its slot.
Hold the card by its edges.
Caution ! The IDPROM can be dislodged easily. Ensure the IDPROM is not
dislodged from the system controller during handling.
5. Place the system controller card on an anti-static mat.
6. Press the battery mounting tabs away from the battery.
7. Remove the battery from its receptacle on the system controller card.
8. Insert the new battery into the carrier.
Ensure the positive +ve side of the battery is facing inward.
9. Press firmly and evenly to seat the battery on the system controller card.
The latch in the connector clicks into place when the battery is seated correctly.
10. Re-install the system controller
11. Replace the main cover

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Boot and check for full functionality

PARTS NOTE:

REFERENCE INFORMATION:

Sun Fire V445 Server Service Manual: http://download.oracle.com/docs/cd/E19088-01/v445.srvr/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback