Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1310044.1
Update Date:2016-01-20
Keywords:

Solution Type  Technical Instruction Sure

Solution  1310044.1 :   How to remove and replace a Starcat Center Plane Support Board:ATR:1523:4  


Related Items
  • Sun Fire E25K Server
  •  
  • Sun Fire 15K Server
  •  
  • Sun Fire 12K Server
  •  
  • Sun Fire E20K Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Oracle Confidential (INTERNAL). Do not distribute to customers.
Reason: FRU CAP

Applies to:

Sun Fire 15K Server - Version Not Applicable and later
Sun Fire 12K Server - Version Not Applicable and later
Sun Fire E25K Server - Version Not Applicable and later
Sun Fire E20K Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to remove and replace a Starcat Center Plane Support Board
********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1310044.1
********************************************************************************

Fix

CAP PROBLEM OVERVIEW: CSB replacement (CSB supports centerplane)

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:
Starcat Training, Familiarity with SMS command set

TASK COMPLEXITY: 4

TIME ESTIMATE: 90 minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
Customer should fail-over to the OTHER SC and disable SMS failover

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Note: all commands need to be executed on the MAIN SC.

Note: Before shutting down and replacing an SC make sure that clock from the other SC to all components is in a good state. To check this run "showboards -c" command for SMS 1.4 and later. ( See *Document ID: 1006413.1 - Check clock status before replacement of System controller for more information )

Preparation:
As user sms-svc (or another user with platform privileges), verify:
- that the other SC is MAIN (showfailover -r)
- that the other SC is the current clock source (showboards -c)
- that failover is disabled (showfailover)
- the system is using the other CSB ( showbus )
- Use dynamic bus reconfiguration to specify the Sun Fireplane interconnect assembly half that will remain active. Type the following command: [ setbus -c x ] where x is CS0 or CS1. This represents the centerplane support board that will remain powered on.
- shut down SC attached to faulty CSB (init 0), then power it off from the main using "poweroff scX csX"

Replace CSB:
- Physically remove SC and SCPER and place on antistatic mat
- Remove CSB carrier plate and place on second antistatic mat
- Replace faulty CSB
- Replace carrier plate into chassis
- IMPORTANT: insert SCPER board BEFORE inserting SC. Insert SCPER, then SC.

Calibrate CSB:
- IMPORTANT: Wait 5 minutes before continuing -- this is required for thermal calibration
- Run "thermcal -w CS<0/1>" to perform thermal calibration.
- Run "updateseeprom platformtype <value>"

         platformtype: <value>={F12K|SunFire12K|F15K|SunFire15K|E20K|SunFireE20K|E25K|SunFireE25K}


Final Steps:
NOTE: Verify SMS is running on the spare SC before proceeding to the next step.
- Restart SMS on the MAIN SC. Allow 60 seconds between stopping SMS and restarting SMS to allow processes to fully exit.
- If previously deconfigured, use the dynamic bus reconfiguration to enable both halves of the Sun Fireplane interconnect assembly.  [  sc% setbus -c cs0,cs1 ]
- Enable failover by typing "setfailover on" on the Main SC.

OBTAIN CUSTOMER ACCEPTANCE: N/A

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
N/A

REFERENCE INFORMATION:
Service Manual: http://download.oracle.com/docs/cd/E19065-01/servers.e25k/index.html
Sun Fire[TM] 12K/15K/E20K/E25K: Replacement Procedure for the Centerplane Support Board (Doc ID 1009551.1)


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback