![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 1310038.1 : How to remove and replace a Starcat ( Centerplane ) Interconnect Board:ATR:1522:4
In this Document
Oracle Confidential (INTERNAL). Do not distribute to customers
Applies to:Sun Fire 15K Server - Version: Not ApplicableSun Fire E20K Server - Version: Not Applicable and later [Release: N/A and later] Sun Fire E25K Server - Version: Not Applicable and later [Release: N/A and later] Sun Fire 12K Server - Version: Not Applicable and later [Release: N/A and later] Information in this document applies to any platform. GoalHow to remove and replace a Starcat Interconnect BoardSolutionCAP PROBLEM OVERVIEW: Interconnect Board(Fireplane) failureDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE ENGINEER NEED: Starcat Training Knowledge of SMS commands TASK COMPLEXITY: 4 TIME ESTIMATE: 240 minutes DELIVERY REQUIREMENT: Immediate FIELD ENGINEER INSTRUCTIONS WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : N/A WHAT ACTION DOES THE ENGINEER NEED TO TAKE: 1) Power off the entire system - Shut down all domain domain_name# shutdown -y -g <seconds> -i 0 - Power off all boards except the power supplies, fans, and the SCs. sc% poweroff - shutdown the spare SC then power off the spare SC from the main SC spare_sc# shutdown -y -g <seconds> -i 0 sc% poweroff SCx (SCx is the spare SC) - Shut down the main SC sc# shutdown -y -g <second> -i 0 - Power off the AC0 and AC1 circuit breaker for all power supplies - Disconnect the twelve AC power cords 2) Remove the interconnect board from the chassis (Following the repair procedures described in the service manual) 3) Install the interconnect board into the chassis (Following the repair procedures described in the service manual) 4) Power on the system controller - Connect the AC power cords and all I/O cables - Power on the AC0 and AC1, both SCs will begin booting. 5) Power on the centerplane support board - Power on the centerplane support board and calibrate its temperature sc% thermcal -w scx - Update the system SEEPROMs sc% updateeeprom <platformtype> <value> - Restart SMS sc% /etc/init.d/sms stop sc% /etc/init.d/sms start - If previously deconfigured the system bus, enable both buses sc% setbus -c cs0,cs1 6) Power on the domain OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: N/A PARTS NOTE: N/A REFERENCE INFORMATION: Service Manual: http://download.oracle.com/docs/cd/E19065-01/servers.e25k/index.html FAB# 1000668.1 (The thermal utility should be run if a Centerplane or Center Plane Support Board is replaced on the Sun Fire 12K/15K/E20K/E25K) Sun Confidential: Internal Only References<NOTE:1000668.1> - The thermcal utility should be run if a Centerplane or Centerplane Support Board (CSB) is replaced on the Sun Fire 12K/15K/E20K/E25K.Attachments This solution has no attachment |
||||||||||||
|