Asset ID: |
1-71-1306935.1 |
Update Date: | 2017-03-22 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1306935.1
:
How to Remove and Replace a CHA - Front End Adapter:ATR:949:4
Related Items |
- Sun Storage 9985 System
- Sun Storage 9990 System
- Sun Storage 9970 System
- Sun Storage 9990V System
- Sun Storage 9910 System
- Sun Storage 9960 System
- Sun Storage 9985V System
- Sun Storage 9980 System
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP
Applies to:
Sun Storage 9910 System - Version Not Applicable and later
Sun Storage 9980 System - Version Not Applicable and later
Sun Storage 9985 System - Version Not Applicable and later
Sun Storage 9990 System - Version Not Applicable and later
Sun Storage 9970 System - Version Not Applicable and later
Information in this document applies to any platform.
Goal
How to Remove and Replace a CHA - Front End Adapter
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
HDS Product Training on CHA replacement and SVP operation.
TIME ESTIMATE: 20 Minutes
FIELD ENGINEER INSTRUCTIONS
PROBLEM OVERVIEW:
- Processor blocking
- CHKX threshold over
CONFIRM THE FAULT BY CHECKING:
Verify through SIM Log and BY using Maintenance Mode of SVP .
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
It Is very important that the Hosts Multipathing software be verified as working before the procedure is started. The CHA PCB is the hosts interface connection to the frame . When the CHA PCB is off-lined , access to the LDEV will be lost if alternate paths to the LDEV are not configured and working correctly through alternate CHA PCB's .
It is also not recommended to perform this procedure during a period of heavy I/O .
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
- Customer verify that mulitpathing works on Hosts accessing the Frame
- Enter maintenance mode in SVP
- Select failing component and initiate replacement
- Replace CHA
- Continue SVP recovery process
- Complete Sim
CONFIRM THE FIX BY:
Verify through the maintenance mode on the SVP , Verify that the customer has access to CHA ports.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Verify that the host in use have access to the Ldev through All Paths .
PARTS NOTE:
<special notes regarding parts>
ADDITIONAL COMMENTS:
Replacement procedure is RCH1 for all arrays except 9985 , which uses
RMX1 for MIX PCB in addition to RCH1 .
The documents referenced below can be found on site on the array microcode CD.
9990V - 14acc.pdf page ACC04-30 ===> 07rep.pdf page REP01-290
9985V - 14acc.pdf page ACC04-20 ===> 07rep.pdf page REP01-290
9990 - 14acc.pdf page ACC04-40 ===> 07rep.pdf page REP01-181
9985 - 14acc.pdf page ACC04-20/ACC04-40 ===> 07rep.pdf page REP01-280
9980 - 14acc.pdf page ACC04-20 ===> 07rep.pdf page REP01-160
9970 - 14acc.pdf page ACC05-20 ===> 07rep.pdf page REP01-160
9960 - 14acc.pdf page ACC04-20/ACC05-20 ===> 07rep.pdf page REP01-160
9910 - 14acc.pdf page ACC04-20/ACC05-20 ===> 07rep.pdf page REP01-160
Attachments
This solution has no attachment