Asset ID: |
1-71-1306114.1 |
Update Date: | 2017-11-30 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1306114.1
:
How To Remove and Replace V210 Power Supply:ATR:863:0
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
|
In this Document
Applies to:
Sun Fire V210 Server - Version Not Applicable and later
Information in this document applies to any platform.
Goal
********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1306114.1
********************************************************************************
How To Remove and Replace V210 Power Supply
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS ARE REQUIRED
No special skills required, Customer Replaceable Unit (CRU) procedure
Time Estimate: 30 minutes
TASK COMPLEXITY: 0
REMOVAL/REPLACEMENT INSTRUCTIONS
PROBLEM OVERVIEW: Power Supply Failure
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
System uses a single power supply configuration, the customer should take normal precautions to backup data, notify users of the maintenance and that the system will be powered down. The customer should conduct an orderly software system shutdown.
WHAT ACTIONS ARE REQUIRED:
Follow standard ESD procedures to avoid Electrostatic Discharge
Remove the power supply:
1.Power off the server.
2.Ensure that the server is properly grounded.
3.Remove the cover assembly.
4.Disconnect the cables leading to the system board and interface board.
5.Undo the two screws on the back panel of the server.
6.Move the PSU towards the front of the server to release it from the locating tab on the base of the server.
7.Lift the PSU out of the chassis.
Replace the power supply:
1.Position the new PSU over the location tab and slide it towards the back of the server.
2.Install and tighten the two screws on the back panel of the server.
3.Connect the power supply wiring harness to the connectors on the system board and interface board.
4.Install the cover assembly.
5. Power on Server
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTIONS ARE REQUIRED TO RETURN the SYSTEM TO AN OPERATIONAL STATE:
Restart software applications per applicable administration guides to resume system operation.
PARTS NOTE:
Sun Fire V210 RoHS
https://support.oracle.com/handbook_private/Systems/SunFireV210_R/components.html#Power
Sun Fire V210 (pre RoHS)
https://support.oracle.com/handbook_private/Systems/SunFireV210/components.html#Power
REFERENCE INFORMATION: Service Manual and Admin Guide
http://docs.oracle.com/cd/E19088-01/v210.srvr/index.html
Attachments
This solution has no attachment