Asset ID: |
1-71-1305344.1 |
Update Date: | 2017-08-14 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1305344.1
:
How to Replace a T5120 and T5220 Cable Kit [VCAP]
Related Items |
- Sun SPARC Enterprise T5220 Server
- Sun SPARC Enterprise T5120 Server
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
- Microlearning>Video>ML-VID-VCAP
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP
Applies to:
Sun SPARC Enterprise T5220 Server - Version All Versions to All Versions [Release All Releases]
Sun SPARC Enterprise T5120 Server - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.
Goal
How to Replace a Sun SPARC T5120/T5220 Cable Kit
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:
T5120/T5220 product knowledge/training to be qualified as Oracle service personel.
TIME ESTIMATE: 30 minutes
Task Complexity: 1
FIELD ENGINEER INSTRUCTIONS
PROBLEM OVERVIEW:
Defective SAS cable
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution.
System needs to be shutdown by customer
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
There are three different cable kits available for the T5120:
FRU 530-3896 : 4 disks backplane using on-board HW raid
FRU 560-2911 : 8 disks backplane using on-board HW raid
FRU 560-2920 : 4 and 8 disks backplane using the SAS RAID HBA PCIe card
And two kits for the T5220:
FRU 530-3896 : 8 and 16 disks backplane using on-board HW raid
FRU 560-2921 : 8 and 16 disks backplane using the SAS RAID HBA PCIe card
Check customer configurations and order the needed kit
*** Follow standard ESD procedures to avoid Electrostatic Discharge
1. Power off the server
2. Disconnect all power cables
3. Disconnect any data cables connected to any PCIe/XAUI card if needed
4. Remove the Top Cover
-Unlatch the fan module door by pulling the release tabs back to release the door
-Press the top cover release button and slide the top cover to the rear about a 0.5 inch
-Lift up and remove the cover
5. Replace cables routing them as they were before
6. After replacement reverse the order of fixing as mentioned in above points
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Have customer check all disks access
PARTS DETAILS:
https://support.oracle.com/handbook_partner/Systems/SE_T5120/components.html
https://support.oracle.com/handbook_partner/Systems/SE_T5220/components.html
REFERENCE INFORMATION:
Sun SPARC Enterprise T5120 and T5220 Servers Service Manual
http://download.oracle.com/docs/cd/E19839-01/
Save
Attachments
This solution has no attachment