1302164.1
:
M8000/M9000 IOU Replacement:ATR:1868:2
Related Items |
- Sun SPARC Enterprise M9000-64 Server
- Sun SPARC Enterprise M9000-32 Server
- Sun SPARC Enterprise M8000 Server
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
|
In this Document
Goal
Solution
Oracle Confidential (INTERNAL). Do not distribute to customers
Reason: FRU CAP
Applies to:
Sun SPARC Enterprise M8000 Server - Version: Not Applicable and later [Release: N/A and later ] Sun SPARC Enterprise M9000-32 Server - Version: Not Applicable and later [Release: N/A and later] Sun SPARC Enterprise M9000-64 Server - Version: Not Applicable and later [Release: N/A and later] Information in this document applies to any platform.
Goal
CAP PROBLEM OVERVIEW: M8000/M9000 IOU replacement
******************************************************************************** To report errors or request improvements on this procedure, please go to http://support.us.oracle.com and put a comment on Doc ID: 1302164.1 ********************************************************************************
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) The engineer should be M8000/M9000 trained
TASK COMPLEXITY: 2
Time Estimate: 150 minutes
FIELD ENGINEER INSTRUCTIONS
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution For an active replacement the customer is not required to perform a system shutdown For a hot replacement the customer is required to perform a domain(s) shutdown For a cold replacement the customer should conduct an orderly software system shutdown. Then power down the entire platform.
Review and follow <Document 1021062.1> while working with removed IOU.
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Active Replacement
If domain consists of all Sparc64 VII or Sparc64 VII+ processors
the domain will have had to have been powered on with cpumode set to
compatible for DR to work with a Sparc64 VI CMU. If the XSB is in quad mode the sb will need to be removed from all domains it is associated with.
- Connect to serial port of the active XSCF to ensure that communication will not be lost
- Execute showfru, showdcl, showboards to identify the affected domains
IO to the XSB must be quiesced to perform the next steps. See the DR Users Guide chapter 2 for more information.
- If the xsb contains an IOUA card the card will need to be deconfigured.
XSCF> cfgdevice -l XSCF> cfgdevice -c detach -p port_no
- Execute the deleteboard command to dynamically disconnect the IOU to be removed from all the affected domains
- Execute the replacefru command
- On the maintenance menu, select 1, "CMU/IOU."
- From here, perform the operation according to the guidance displayed in the maintenance menu
- Remove the IOU
- Transfer all components to the replacement IOU
- Reinstall the IOU
- Continue to follow the instructions from the maintenance menu. When the display of the maintenance menu returns to the initial page exit the maintenance menu
- Execute the addboard command to dynamically connect the IOU to all the affected domains
Hot Replacement
- Connect to serial port of the active XSCF to ensure that communication will not be lost
- Execute showfru, showdcl, showboards to identify the affected domains
- Execute the poweroff -d command to shut down the affected domains
- Execute the replacefru command
- On the maintenance menu, select 1, "CMU/IOU."
- From here, perform the operation according to the guidance displayed in the maintenance menu
- Remove the IOU
- Transfer all components to the replacement IOU
- Reinstall the IOU
- Continue to follow the instructions from the maintenance menu. When the display of the maintenance menu returns to the initial page exit the maintenance menu
- Execute the poweron -d command to power on the affected domains
Cold Replacement
- Customer should perform an orderly shutdown of the domains.
- Change the mode switch setting on the operator panel from Locked to Service.
- From a console that is connected to XSCF, log in to XSCF, and execute the poweroff -a command.
- Confirm that the power-off processing is completed by confirming that the POWER LED (green) on the operator panel is off.
Note: On a M9000 with an expansion cabinet the base cabinet should be switched off first then the expansion cabinet.
- Switch off all main line switches for the AC section (ACS) in the power supply system.
- Remove the IOU
- Transfer all components to the replacement IOU
- Reinstall the IOU
Note: On a M9000 with an expansion cabinet the expansion cabinet should be switched on first then the base cabinet.
- Switch on all main line switches for the AC section (ACS) in the power supply system.
- Confirm that the XSCF STANDBY LED (green) on the operator panel remains lit. If it is blinking, wait until it remains lit.
- Start (turn on power) all domains together
When the maintenance work is completed, be sure to confirm the mode switch setting and return the switch to Locked. OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Check full functionality has been retained
Confirm hardware by running the following commands: XSCF> showhardconf -M XSCF> showstatus
PARTS NOTE:
None
REFERENCE INFORMATION: For more information on DR please use the Dynamic Reconfiguration (DR) Users Guide http://download.oracle.com/docs/cd/E19415-01/821-2796-11 Service Manual: http://download.oracle.com/docs/cd/E19415-01/index.html