Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-79-2218789.1
Update Date:2017-08-23
Keywords:

Solution Type  Predictive Self-Healing Sure

Solution  2218789.1 :   M12-device.fail_psu - A PSU signaled that it has failed  


Related Items
  • Fujitsu SPARC M12-1
  •  
  • Fujitsu SPARC M12-2
  •  
  • Fujitsu SPARC M12-2S
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: Sun PSH
  •  




In this Document
Purpose
Scope
Details
References


Applies to:

Fujitsu SPARC M12-2
Fujitsu SPARC M12-2S
Fujitsu SPARC M12-1
SPARC

Purpose

Provide additional information for message ID: M12-device.fail_psu

Fujitsu fault codes:

018F0002, 018F0003, 01910ef0

Scope

 

Details

Type

Hardware Fault
   device.fail_psu

Severity

Major

Description

A fault occurred when a PSU signaled that it has failed.

Automated Response

If there are insufficient operational PSUs to power the box, then the box is powered down. Otherwise, no action is taken.

When the box is an M12-2S Building Block or XB-Box, a Ppar using the box will have the Building Block removed from the configuration or one XB way deconfigured at next power on.

The platform administrator should schedule a service action.

Impact

The PSU is deconfigured. If there are insufficient operational PSUs:
- the platform becomes unbootable for M12-1 or M12-2 systems.
- the Building Block becomes unbootable for M12-2S systems.
- the XB-box becomes unbootable, and Building Blocks using this XB-Box will start with one deconfigured XB way at next power-on.

Indicted Hardware

The PSU is marked for replacement.

Suggested Action for System Administrator

The recommended service action for this event is to schedule replacement of the affected component(s) at the earliest possible convenience. Although the hardware may be functioning, it is not intended nor recommended that the faulted component(s) remain in the system for a prolonged period of time.

Refer to the following document for the latest procedures for displaying event content in preparation for submitting a service request and applying any post-repair actions that may be required.

PSH Procedural Article for Fujitsu M10 Diagnosis (Doc ID 1525156.1)

 

 

 

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback