Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-79-2078646.1
Update Date:2017-01-19
Keywords:

Solution Type  Predictive Self-Healing Sure

Solution  2078646.1 :   FMM-8000-5Y - Invalid Frame hardware configuration  


Related Items
  • Netra Modular System
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: Sun PSH
  •  




In this Document
Purpose
Details
References


Applies to:

Netra Modular System
Information in this document applies to any platform.

Purpose

 Provide additional information for message ID: FMM-8000-5Y

Details

 Invalid Frame hardware configuration

Type

Fault

fault.frame.invalid-hw-configuration

Severity

Major

Description

The frame monitoring module has determined a problem exists with the cable harness.

Location known by frame monitoring module (FMM) doesn't match the
physical location of the frame backplane module (FBN) in the rack.

This fault will only occur when a cable harness is incorrectly wired
between the frame monitoring module (FMM) and frame backplane node (FBN).

Result will be loss of frame management monitoring of compute nodes due to incorrect addressing.

Verify the cable harness connections between the frame monitoring module (FMM) and frame backplane nodes (FBN) are correct.

 

Automated Response

Frame level service-required LED is illuminated.

Impact

Loss of frame management monitoring of compute nodes.

Suggested Action for System Administrator

Contact Oracle Support Services.

Refer to the following document for the latest procedures for displaying event content in preparation for submitting a service request and applying any post-repair actions that may be required.

PSH Procedural Article for ILOM-Based Diagnosis (Doc ID 1155200.1)


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback