Asset ID: |
1-79-1524227.1 |
Update Date: | 2017-09-19 |
Keywords: | |
Solution Type
Predictive Self-Healing Sure
Solution
1524227.1
:
SPSUN4V-8000-YE - IO interconnect failure during power-on testing
Related Items |
- SPARC M5-32
- SPARC T8-1
- SPARC T8-4
- SPARC M7-8
- SPARC T7-4
- SPARC T5-1B
- Oracle SuperCluster M7 Hardware
- SPARC M8-8
- Oracle SuperCluster M6-32 Hardware
- SPARC T8-2
- SPARC T7-2
- SPARC T5-2
- Oracle SuperCluster M8 Hardware
- SPARC T5-4
- SPARC M7-16
- SPARC T7-1
- SPARC M6-32
- SPARC T5-8
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: Sun PSH
|
In this Document
Applies to:
SPARC T5-4
SPARC T5-8
SPARC M7-8
SPARC M7-16
SPARC T7-1
Information in this document applies to any platform.
Purpose
Additional Information for Message ID: SPSUN4V-8000-YE
Details
Type: Hardware Fault
fault.io.pciex.bus-linkerr
Severity: Major
Description
An IO interconnect has failed to initialize during poweron testing.
Automated Response
No automated response
Impact
Some services may be lost due to the missing interconnect
Suggested Action for System Administrator
The administrator should arrange to have the FRU containing the faulty component replaced.
Refer to the following document for the latest procedures for displaying event content in preparation for submitting a service request and applying any post-repair actions that may be required.
PSH Procedural Article for ILOM-Based Diagnosis (Doc ID 1155200.1)
Additional Information
No additional information available at this time.
Attachments
This solution has no attachment