![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||||||
Solution Type Problem Resolution Sure Solution 2203249.1 : SL8500 - DC Power Supplies 19,20,21,22 Are Not Working After Initial Installation
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun StorageTek SL8500 Modular Library System - Version All Versions to All Versions [Release All Releases]Information in this document applies to any platform. SymptomsSL8500 DC power supplies 19,20,21,22 are not working after initial installation. DC power supplies 23 and 24 are working properly. ChangesInitial installation. CauseCable J610-J320 between lower and upper modules is not properly seated. SolutionSecured connector J610 and J320. KB SL85000 - Common Build Issues (Doc ID 2111622.1) mentions: "AC2 Rail power supplies in top slots 23-24 have green lights blinking, not fully enabled – Check short HBF1 to HBF2 interconnect cable J320 to J610" Additional problem symptom is disabled power supplies 19,20,21 and 22. References<NOTE:2111622.1> - SL8500 - Common Build IssuesAttachments This solution has no attachment |
||||||||||||||||||||
|