Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-72-2183510.1
Update Date:2016-09-19
Keywords:

Solution Type  Problem Resolution Sure

Solution  2183510.1 :   Diameter Signaling Router (DSR) - Unrelated SBR Migration Plans Getting 'Prepared' on Preparing 1 set of plans  


Related Items
  • Oracle Communications Diameter Signaling Router (DSR)
  •  
Related Categories
  • PLA-Support>Sun Systems>CommsGBU>Global Signaling Solutions>SN-SND: Tekelec DSR
  •  




In this Document
Symptoms
Changes
Cause
Solution
References


Applies to:

Oracle Communications Diameter Signaling Router (DSR) - Version DSR 7.1.0 to DSR 7.1.2 [Release DSR 7.0]
Information in this document applies to any platform.

Symptoms

If there are more than 1 set of “SBR Data Migration Plans” of the same type (Mating/Un-Mating/Re-Mating), any admin action performed on a selected plan from SBR Database Reconfiguration GUI, will be applied to all of the plans of the same type currently configured. If the attempted admin action is valid for the selected plan, it will be executed for all the plans regardless of their individual admin states. Two (2) migration plans of different types can be executed independently.

This problem does not affect resizing plans, which can always be executed independently, nor does it affect SBR Data Migration Plans of different types.

There is no harm in executing multiple plans of the same type simultaneously, any button click on the SBR Reconfiguration Status screen with a plan selected, will apply to all SBR Data Migration Plans of that same type. This means that the decision to accelerate migration, or force complete migration, for example, will be applied to all plans of that type simultaneously

Changes

 

Cause

There is bug tracking this issue : Bug 24336524 - Unrelated SBR Migration Plans getting 'Prepared' on Preparing 1 set of plans

Solution

 If independent control of a single SBR Data Migration Plan is desired, the user must create only one plan of that type (Mating/Un-Mating/Re-Mating), execute it to completion, and remove the plan prior to preparing another plan of that same type.

References

<BUG:24336524> - UNRELATED SBR MIGRATION PLANS GETTING 'PREPARED' ON PREPARING 1 SET OF PLANS

Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback