![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||
Solution Type Problem Resolution Sure Solution 2032960.1 : SL8500 - RE Kits are Missing the "Y" Power Cables
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun StorageTek SL8500 Modular Library System - Version All Versions and laterInformation in this document applies to any platform. RE = Redundant Electronics SymptomsRE Kits are Missing the "Y" Power Cables. CauseManufacturing packing issue. SolutionThe Redundant Electronics kits for the SL8500 are missing the "Y" IEC320 power cables, PN 7015412. All current stock has this issue. Please check your kit as soon as it arrives and check if it contains 2 of these cables. If not, send an email to phil.garcia@oracle.com and richard.kent@oracle.com to obtain the cables. In the near future we will be able to order these cables from the system. While waiting for the cable, you can connect one PUE switch to the PDU1 feed and the other switch to the PDU2 feed for testing with the straight cables that are provided in the kit. Attachments This solution has no attachment |
||||||||||||||||
|