Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-72-1951952.1
Update Date:2017-11-27
Keywords:

Solution Type  Problem Resolution Sure

Solution  1951952.1 :   BSSAP and RAN Builders Configuration  


Related Items
  • Oracle Communications Performance Intelligence Center (PIC) Software
  •  
Related Categories
  • PLA-Support>Sun Systems>CommsGBU>Global Signaling Solutions>SN-SND: Tekelec PIC
  •  




In this Document
Symptoms
Cause
Solution


Created from <SR 3-9963198011>

Applies to:

Oracle Communications Performance Intelligence Center (PIC) Software - Version 7.1 and later
Tekelec

Symptoms

All the BSSAP xDR are not correlated. The xDR status could be Not Match or Timer status.
The RAN CC and MM have also bad correlation.

Cause

The BSSAP and RAN Builders are enable on a DFP.
The BSCs manage at the same time 2G and 3G traffic. 

Solution

Configure the SCCP intermediate builder for all the DFPs like on the screen copy for example. The operation has to be done on NSP CCM Application.

The 2G Point Codes muist be included in the traffic sent to the BSSAP builder. Same Point Codes must be excluded from the traffic sent to the RANAP builders.

With ProTrace it is possible to identify the 2G and 3G Point Codes:

  • 2G Point Codes  have the protocol field = BSSAP
  • 3G Point Codes have the protocol field = UMTS


SCCP intermediate builder configuration


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback