Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-72-1923810.1
Update Date:2015-04-25
Keywords:

Solution Type  Problem Resolution Sure

Solution  1923810.1 :   Error From Verify-topology Command Running exachk on a "Non-Standard" System  


Related Items
  • Oracle Exadata Hardware
  •  
  • Exadata Database Machine X2-2 Hardware
  •  
Related Categories
  • PLA-Support>Eng Systems>Exadata/ODA/SSC>Oracle Exadata>DB: Exadata_EST
  •  




In this Document
Symptoms
Changes
Cause
Solution
References


Created from <SR 3-9563064361>

Applies to:

Oracle Exadata Hardware - Version 11.2.0.3 and later
Exadata Database Machine X2-2 Hardware - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Symptoms

exachk runs the following:

/opt/oracle.SupportTools/ibdiagtools/verify-topology -t fattree

 

May raise output such as the following:

       [ DB Machine Infiniband Cabling Topology Verification Tool ]
               [Version IBD VER 2.d ]
External non-Exadata-image nodes found:
...will check for ZFS if on SSC - else ignore

Found 2 leaf, 0 spine, 0 top spine switches

Check if all hosts have 2 HCAs to different switches...............[SUCCESS]
Leaf switch check: cardinality and even distribution..............
[ERROR] Leaf Switch _IP_ with GUID _guid_ has fewer than 4 compute nodes links. It has 2 links ( 14A 13B) to compute nodes

[ERROR] Leaf Switch _IP_ with GUID _guid_ as fewer than 7 links to storage cells. It has 5 links ( 17A 17B 16A 16B 15B)to storage cells

[ERROR] Leaf Switch _IP_ with GUID _guid_ has fewer than 4 compute nodes links. It has 2 links (14A 13B ) to compute nodes

[ERROR] Leaf Switch _IP_ with GUID _guid_ has fewer than 7 links to storage cells. It has 5 links (17A 17B 16A 16B 15B )to storage cells

[ERROR] 2 switches did not meet this requirement

Spine switch check: Are any Exadata nodes connected ..............[SUCCESS]
Spine switch check: Any inter spine switch links..................[SUCCESS]
Spine switch check: Any inter top-spine switch links..............[SUCCESS]
Spine switch check: Correct number of spine-leaf links............[SUCCESS]
Leaf switch check: Inter-leaf link check..........................[SUCCESS]
Leaf switch check: Correct number of leaf-spine links.............[SUCCESS]

 

Changes

 A standard confguration (such as a quarter rack in this case) was modified (for the scenario reported, 2 new storage cells were added).

Cause

exachk did not know how to manage the non-standard configuration when evaluating the system.
This is being investigated in the exachk Enhancement Request <Bug 16371186> - VERIFY-TOPOLOGY ERRORS

Solution

Manually run the verify-topology command with the base configuration type.
ie in the case here, a quarter rack:

/opt/oracle.SupportTools/ibdiagtools/verify-topology -t quarterrack

 

References

<BUG:16371186> - VERIFY-TOPOLOGY ERRORS

Attachments
This solution has no attachment