Oracle System Handbook
- ISO 7.0 May 2018 Internal/Partner Edition
Home
|
Current Systems
|
Former STK Products
|
EOL Systems
|
Components
|
General Info
|
Search
|
Feedback
N2040 Secure Application Switch
Codename:
Chromis 1
Premier Support End Date = January 2017
Follow
this link
to view Service Life End Dates.
N2040
541-0202
N2040V
541-0202
N2040Z
541-1424
N2040VZ
541-1424
Assembly/FRU
System Board
SSL Function Card
Power Supply ×2
Assembly/FRU
System Board
SSL Function Card
Power Supply ×2
Virtualization Enabled
Assembly/FRU
System Board
SSL Function Card
Power Supply ×2
Assembly/FRU
System Board
SSL Function Card
Power Supply ×2
Virtualization Enabled
Front View
Rear View
Notes
SFPs are not included with the N2040 Secure Application Switch.
Ethernet cables are not included with Option 2001 or Option 2002.
Ethernet cables are not included with the N2040 Secure Application Switch.
Rack Mount Kit 560-2777 is included with the N2040 Secure Application Switch.
Rack Mount Kit 560-2820 is included with the post July 2006 N2040 Secure Application Switch.
Console Port Cable 530-3347 is included with the N2040 Secure Application Switch.
Patches
Patch
118724-01
V2.0 Service Update 1, 12/13/04.
Patch
118724-02
V2.0 Service Update 2, 01/26/05.
Patch
118724-03
V2.0 Service Update 3, 03/17/05.
Patch
118724-04
V2.0 Service Update 4, 06/23/05.
Patch
118724-05
V2.0 Service Update 5, 09/13/05.
Patch
118724-06
V2.0 Service Update 6, 03/07/06.
References
Secure Application Switch - N2000 Series Documentation.
Copyright © 2018 Oracle and/or its affiliates. All rights reserved.
Feedback