Sun Microsystems, Inc.   Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

DC Power Distribution Board

501-4683

Enterprise 250 Codename: Javelin

Notes

  1. If the system is powered off from software with the keyswitch On and AC power is removed and reapplied, the system will power on. The system should remain off. This is fixed on PDB 501-4683-06.
  2. The POK signals tend to float to the OK state and may cause NVRAM corruption during removal or replacement if the DC harness is connected between the PDB and System Board. This is fixed on PDB 501-4683-06. Disconnecting the harness before NVRAM removal and replacement is recommended in Enterprise 250 Server Product Notes, 805-3399.

  Copyright © 2018 Oracle and/or its affiliates.  All rights reserved.
 Feedback